GENERAL INFORMATION


SCROLL DOWN

GENERAL INFORMATION


 ELEVATORS

WHEN TO USE THIS BASIS OF DESIGN SECTION:

This BOD section should be used in all new construction projects, in all rehab projects with elevator work in their scope, and when doing elevator replacements or modernizations.


elevator replacements & modernizations:

  • FOR PROPERTY STAFF:

    • Reach out to a combination of national firms and well-established local firms for bids.

    • At least (3) bids should be received that detail necessary work and optional work.

    • Ensure there’s a service provider before purchasing. A proposal for ongoing maintenance service could also be considered.

  • When modernizing an elevator, include the necessary cabling for installing a video camera.

FINISHES:

  • Walls/Panels:

    • Plastic laminate should be used for all panels throughout the interior.

    • Avoid using dark colors or dark wood looks.

    • No stainless steel.

  • Flooring: Vinyl plank is required. See the Common Areas Flooring section for general information, required details, and product options.

  • Lighting: See the Lighting section for general information and required details.

  • Cab Buttons:

    • Flat or Concave styles are required.

    • Material should be stainless steel.

  • Guides & Proximity Sensors: Both solid guides and proximity sensors are required at high-rise senior properties. They are recommended in all properties.