COMMON area FLOORING


NEW CONSTRUCTION:

  • Architect to provide common area floor design for all spaces in building.
  • Follow compartmentalization/ air sealing per architect’s details. If not included in details, highlight for architect.

REHABS:

  • Architect to provide common area floor design for all spaces in building.
  • Moisture testing is required in basement or slab on grade units.
  • All new flooring requires a level subfloor free from cracks, bumps and excessive adhesive residue from former floors.
    • Subcontractor must evaluate existing subfloor condition and include associated costs for necessary repairs in their bid. 

PROPERTY MANAGEMENT:

  • Contact Design + Building Performance Dept. for design support.
  © Johnsonite

© Johnsonite

 © Johnsonite

© Johnsonite

  ©   Armstrong

© Armstrong